Assignment 2.1: Define Scope with a Work Breakdown Structure
In the previous module, you began to plan for scope by developing a Project Charter and a Project Scope Statement. Now you will continue with Scope Planning by developing a work breakdown structure (WBS).
Procedure
1.Review the results from the previous application (the Project Charter and the Project Scope Statement).
2.Create a work breakdown structure for the project, using these criteria: ?It must be easy to interpret, such as a hierarchical list and/or a flow chart.
3.It must be possible for your instructor and other
classmates to view it.